Piping Solutions Plant Info


 

 

Plant Facilities

Fabrication / Weld Area

Fabrication Space 100% Crane Served
42,000 Sq. Ft. fabrication/assembly area

10 Tig Weld Stations

Lifting Capacity

Up To 100,000 Lbs

3 Automated Pipe Weld Stations

Loading Doors

18ft wide x 18ft high overhead bay door
14ft wide x 14ft high overhead bay door
3 Structural Steel Weld Stations

Max unit size

17ft wide x 16ft high x 60ft long


Pipe size Capacity

24” Diameter pipe size & under in all thickness ranges

Welding   

A.S.M.E. Section IX certified

Fabrication

Welding Process
  • FCAW (Shielded Flux Core)
  • SMAW (Stick)
  • GTAW (Tig)
  • GMAW (Mig)
  • Polypropylene Fusion Welding

Materials
  • Carbon Steel (P1 Material)
  • Stainless Steel (P8 Material)
  • Alloy 20 (P45 Material)
  • Inconel
  • Alloy 2205 Duplex Stainless (P10H Material)
   
   
    Piping
  • ASME B31.1 Power Piping
  • ASME B31.3 Process Piping
  • On site passivation of stainless steel piping in accordance with ASME A967-13
  • Threaded
  • Polypropylene and Teflon lined
  • Victaulic
  • Sanitary (Tri-Clover)
  • PVC/CPVC
  • PVDV / Polypropylene
  • FRP (Fiber Reinforced Plastic)(Certified Conley Fabricator)
  • Fusion Welded Pipe
Structural Steel
  • AWS D1.1
  • Handrails, Stairways, and Ladders in both Carbon and Stainless Steel
  • Pipe support and instrument sanctions

System Control Panels Fabricated  UL Certified

  • PLC control panels
  • SCR panels
  • Solenoid cabinets
  • Junction boxes

P.E.D. EN-287-1:2004
(Pressure Equipment Directive)

Non-Destructive Testing
Welding Process
  • FCAW (Shielded Flux Core)
  • GTAW (TIG)

Materials
  • Stainless Steel (P8 Material)
  • Carbon Steel (P1 Material)
   
  • X-ray
  • Magnetic Particle
  • Ultrasonic
  • Liquid Penetrant
  • Brinnell Hardness
  • PMI

Process Skid Assembly

  • Complete Modular Piping Systems assembled in accordance with customer specs
  • From simple pump skids to complex piping modules complete with instruments and controls
  • Complete Electrical system capability in accordance with the National Electric Code (NEC) Including Hazardous Locations, Class I, Div. I & II
  • Pneumatic and Process Tubing layout and bending
  • Completed hydro/pneumatic systems and functionally tested


 

Piping Solutions

333 Cedar Avenue Building B, Suite 6 Middlesex, NJ 08846
Shipping & Receiving Warehouse 333 Cedar Avenue Building A, Middlesex, NJ 08846

Phone: 732.537.1009

www.daburn.com/piping-solutions.com

 Established 2000